Wahana Coal Port

Wahana Coal Port

1.8 km, 3,500 tph coal loading conveyor system

Wahana Coal Port
Industry: Coal Port / Bulk Handling
Location: Indonesia
Services: Engineering, Fabrication, Erection
Status: Completed

Project Overview

Engineering, fabrication, and erection of a 1.8 kilometre coal loading conveyor system for the Wahana coal terminal operated by PT Bayan Resources Tbk. The plant delivers 3,500 tonnes per hour of run-of-mine coal from the stockyard along an offshore jetty to the bulk carrier loading point.

Scope of Work

  • Detailed engineering of trestle, conveyor gallery and transfer towers
  • Fabrication of structural steel, conveyor frames and discharge chutes
  • 1.8 km of 1400 mm wide belt conveyor at 3,500 tph capacity
  • Multiple converging stockyard reclaim and transfer conveyors
  • Offshore jetty conveyor and shiploader feed
  • Site erection, commissioning, and handover

Outcome

Continuous high-volume coal export operation, with the loading jetty visible from the air as a single uninterrupted run from yard to ship.

Have a Similar Project?

Talk to our team about how we can deliver conveyor and bulk-handling solutions tailored to your operation.