1.8 km, 3,500 tph coal loading conveyor system
Engineering, fabrication, and erection of a 1.8 kilometre coal loading conveyor system for the Wahana coal terminal operated by PT Bayan Resources Tbk. The plant delivers 3,500 tonnes per hour of run-of-mine coal from the stockyard along an offshore jetty to the bulk carrier loading point.
Continuous high-volume coal export operation, with the loading jetty visible from the air as a single uninterrupted run from yard to ship.