Shiploader Pedestal Base Installation

Drawdown Hoppers (4,000 tph Coal) — Installation

Orange fabricated pedestal lowered into open-cut foundation pit (2006)

Shiploader Pedestal Base Installation
Industry: Coal Mine
Location: Indonesia
Services: Site Erection & Lifting
Status: Completed (2006)

Project Overview

Heavy-lift installation of an orange-painted pedestal base into its open-cut foundation pit, photographed in March 2006. Mobile crawler crane on standby with a workforce guiding the lift, and a precast culvert ring next to the pit for the conduit run-in.

Scope of Work

  • Foundation pit preparation
  • Pedestal heavy-lift rigging plan
  • Anchor bolt setting and grouting
  • Tie-in to upstream feed conveyor

Outcome

Pedestal placed plumb and to drawing, with the upper boom and slew assembly able to follow on the same shutdown.