Orange fabricated pedestal lowered into open-cut foundation pit (2006)
Heavy-lift installation of an orange-painted pedestal base into its open-cut foundation pit, photographed in March 2006. Mobile crawler crane on standby with a workforce guiding the lift, and a precast culvert ring next to the pit for the conduit run-in.
Pedestal placed plumb and to drawing, with the upper boom and slew assembly able to follow on the same shutdown.